Realization process

Step 1: Designing

  • Counseling during the designing process
  • Assistance in selection of kind of material, montage system coordination
  • Preparation the cost calculation, schedule of work
  • Preparing the montage design

podkonstrukcja

sample design of sub-construction

pyty

sample design of plates arrangement

Step 2: Preparing the building site

  • Reconnoiter in the building siteetap2
  • Preparation of the square for store away materials and cutting
  • verification of capacity of access road
  • Preparing the measure of building
  • Arranging the scaffolding

 

 

 

Step 3: Montge the sub-construction

  • Supply the complete sub-construction
  • Plotting on the wall the layout of sub-construction designing in construction project
  • Montage the brackets vertical profiles & painting profiles in fugues

etap3a

etap3b

Step 4: Montage the thermal isolation

  • Supply the wool thermal isolationetap4
  • Montage the mineral wool

 

 

 

 

 

 

Step 5: Montage the plates

  • Supply the plates
  • Cutting the plates according to the dimensions measured in construction project
  • Waterproofed the cutting edge
  • Cleaning the surfaces sub-construction by Sika Cleaner, apply the thin coat of Sika  Primer all over the surface
  • Putting the glue and the tape over the whole length of vertical profiles
  • Placed the façade panels to be fixed in the required position
etap5aetap5betap5c

step 6: Finishing

  • Preparing the glyphs

etap6aetap6b